SITE ENGINEERING

SITE ENGINEERING

SITE ENGINEERING

 

There is desperate need for good Site Engineers on every Construction Site. Either just marking some GRID lines and Building Corners or permanent supervision on bigger construction sites you need someone you can trust.

  • Qualified colleagues
  • Accurate Instruments
  • Flexibility
  • Experience
  • Quality Assurance
  • Quick Response

We are committed to the quality of our jobs and use Leica Total Stations along with unique and efficient methods either on site or in the office.

THE PROCESS

From the moment we start working together we focus on your success. Our job starts even before one of us is on site: Cross-checking the design layouts, highlighting any discrepancies, preparing and ensuring that everything is in the right place.

During our job you can have all the details regarding our tasks. We also collect large amount of data during our presence on site which can be useful for you later.

 

With the Setting Out Proposal Drawings overlaid with the relevant design layouts you can see the overlap between design and reality.

 

The Setting Out Reports on daily or weekly basis ensure that the marks are easily recognisable to avoid any misunderstanding or confusion on site.

STEP 1

 

Checking relevant Design Layouts, Collecting Data for Setting Out.

STEP 3

 

Setting Out on site based on our confirmed drawing.

STEP 2

 

Issuing our Setting Out Proposal Drawing for you to see if there is any issue.

STEP 4

 

Providing Setting Out Report drawings for QA purposes.

Did you know...

 

  • All of our colleagues are Civil Engineers with Bachelor or master's degree and have years of experience
  • Working with us means that you hire a team working for you instead of one Site Engineer
  • The Setting Out Report of marking Column/Wall centre lines on reinforcement can also be used for checking the cover for the bars as it contains the level of the point we marked?
  • The Setting Out Report is a perfect solution to follow the revision of the design was in use on the day of Setting Out?
  • The Setting Out Proposal shows you the lines we can mark you straight away upon request
  • CSI SouthEast Ltd owns several Leica Total Stations (Robotic and Non-Robotic) and GPS/GNSS Rover
  • Our Instruments are calibrated and maintained regularly
  • 99% of cases we can be on site in 24 hours from the phone call
  • CSI SouthEast is fully covered with Public Liability and Professional Indemnity Insurance

SETTING OUT:

 

  • Piles
  • Pilecaps
  • Strip Foundation
  • Brickwork
  • Blockwork
  • Slab Edges
  • Slab Openings
  • Upstands
  • Walls
  • Manholes
  • Drainage runs
  • Pop-ups
  • Roads
  • Kerb Lines
  • Path Edging
  • Steel Frame Buildings
  • Timber Frame Buildings
  • Retaining Walls

 

SITE SURVEYS:

 

  • Initial Site Surveys
  • Level Surveys
  • Volume Estimation
  • Cut/Fill Excercise
  • Manhole Survey
  • As-Built Surveys
  • Slab Deflection Surveys
  • Measured Building Surveys
  • Aerial Surveys

© Copyright 2018. All Rights Reserved.